Installation of the gypsum board walls, bullet resistant panels, security mesh at ceilings and walls, the acoustical ceiling grid, attic stairs, window trim and casework were complete as well as sally port gypsum walls and ceiling. The pitch pockets and flashing for roof penetrations were completed. The duct work and exterior walls were insulated. Painting began and windows and door frames were caulked. The dry valve assembly and compressor for carport dry sprinkler system as installed. Columbia gas installation is completed. The male and female shower units and hot water heater was completed, and the Water Department turned on the domestic water supply to the building. Lighting and exterior lighting was installed. The water heater and recirculation pump, septic system control box and cable rack in server room were completed and labeled by the electrical contractor. National grid connected utility pole to duct bank, the building is now on a permanent power source.
Are we on time? Yes
Are we on budget? Yes
Next Steps: Work continues on the interior and exterior of the building. The committee is working with ACG and Chief Bukunt on FF&E procurement items.