The leaching Field was constructed and connected via the Forced Main to the Pump Chamber and Leach Field. Septic and Pump Tanks were back filled and tested for compaction. Bollards were installed at the electrical service transformer. The car port was erected including steel decking. The roof Curb, HVAC Penetration, Scuppers, and Roof Hip and Low Slope Intersection were flashed. Installed pitch pockets Fire sprinkler system rough and finish work is ongoing. Back flow valve was installed horizontally per Avon Water Department specifications. Installed gas piping to Unit Heaters, ERV and Generator. Pipe labeling ongoing. Installed Domestic Water Backflow and Idler. Installed Firestopping in wall penetrations. Rough inspection complete. HVAC rough installation complete. Control wiring ongoing. Installed fire alarm antenna. Installed conduit to Roof for communications antennas. Completed Rough Installation. Wired Fan Coil Units, Unit Heaters, Generator, Transformer, and Roof Top Units. Installed Firestopping and Penetration. Data Wiring, TV and Low Voltage cabling ongoing. Installed Back Boxes and Conduit for Security and Data adds. Low voltage wiring installed for card readers, cameras, door releases and wireless access points (WAPS)
Are we on time? Yes
Are we on budget? Yes
Next Steps: Work continues on the interior and exterior of the building. The committee is working with ACG and Chief Bukunt on FF&E procurement items.