December saw 4 days of weather impact and with the average temperature being 35 degrees, Page Construction began providing temporary heat on December 17. Excavation and installation of the septic tank and pump chamber is in progress. Excavation and back fill for the carport foundations were completed as well. Carpenters framed interior openings for duct work. They completed the installation of interior blocking, anchor bolts, hurricane clips, and interior door frames. Gypsum board was installed on some walls above finished ceiling and in the mechanical room. Vinyl siding installation is ongoing. Foam insulation was applied and painted with intumescent paint at the underside of the sloped roof. Belcour roofing repaired a wrinkled vapor barrier on the lop slope roof. EPDM membrane was installed. Installation of roof edge flashing and flashing at equipment curbs and penetrations in ongoing. Bello painting applied fire-retardant paint to plywood panel boards and painted walls of the electrical room. Rust Fire Protection began installation of fire sprinkler piping and heads in the attic and first floor, this work is ongoing. Araujo Brothers plumbing installed underground waste pipe to septic tank. Installation of waste and domestic water supply piping, hangars and sink carriers in ongoing. Thomas Snowden obtained a hot work permit for the HVAC and installed 9 VRF units, control unit and gas fired heaters. Installation of duct work, refrigerant piping, condensate drain piping and hangar/supports is ongoing. MV Electric installed conduit, work boxes, MC cable and service to temporary heaters. Security vendor and cabling vendor are now engaged in the project. Weekly project meetings are held with the Project Management Team, Design Team and the General Contractor.
Are we on time? Yes
Are we on budget? Yes
Next Steps: Work continues on the interior and exterior of the building. The committee is working with ACG and Chief Bukunt on the Security System and other FF&E procurement items.